邓宗才, 郭俊平, 肖锐, 2010.一种预应力钢绞线加固混凝土柱体的张拉锚固系统.CN101812924A.
|
郭俊平, 邓宗才, 林劲松等, 2012.预应力高强钢绞线网加固钢筋混凝土板的试验研究.土木工程学报, 45(5):84—92. http://www.cnki.com.cn/Article/CJFDTotal-TMGC201205010.htm
|
郭俊平, 邓宗才, 林劲松等, 2014a.预应力钢绞线网加固钢筋混凝土柱抗震性能试验研究.建筑结构学报, 35(2):128—136. http://www.wanfangdata.com.cn/details/detail.do?_type=perio&id=jzjgxb201402017
|
郭俊平, 邓宗才, 林劲松等, 2014b.预应力钢绞线网加固混凝土圆柱的轴压性能.工程力学, 31(3):129—137. http://www.wanfangdata.com.cn/details/detail.do?_type=perio&id=gclx201403018
|
郭俊平, 邓宗才, 卢海波等, 2013.预应力高强钢绞线网抗剪加固钢筋混凝土梁试验.吉林大学学报(工学版), 44(4):968—977. http://www.wanfangdata.com.cn/details/detail.do?_type=perio&id=jlgydxzrkxxb201404011
|
郭子雄, 黄群贤, 郝娟等, 2015.预应力钢套箍加固RC桥墩轴压性能试验研究.中南大学学报(自然科学版), 46(8):3100—3107. http://www.wanfangdata.com.cn/details/detail.do?_type=perio&id=9759089
|
郭子雄, 吴毅彬, 曾建宇, 2010.预应力钢板箍加固RC短柱抗剪承载力试验研究.工程力学, 27(3):138—144. http://www.wanfangdata.com.cn/details/detail.do?_type=perio&id=gclx201003022
|
郭子雄, 曾建宇, 黄群贤等, 2012.预应力钢板箍加固RC柱轴压性能试验研究.建筑结构学报, 33(11):124—131. http://www.wanfangdata.com.cn/details/detail.do?_type=perio&id=jzjgxb201211015
|
郭子雄, 张杰, 李传林, 2009.预应力钢板箍加固高轴压比框架柱抗震性能研究.土木工程学报, 42(12):112—117. http://www.wanfangdata.com.cn/details/detail.do?_type=perio&id=tmgcxb200912015
|
郭子雄, 张杰, 杨勇, 2006.设置外包预应力钢板箍RC短柱抗震性能研究.哈尔滨工业大学学报, 1(1):140—144. http://www.wanfangdata.com.cn/details/detail.do?_type=perio&id=hebgydxxb200601040
|
洪艺超, 2012.预应力钢板箍加固RC桥墩抗震性能试验研究.泉州: 华侨大学.
|
林劲松, 2009.预应力钢丝绳固定装备.CN201314125.
|
刘灿, 2010.采用竖向预应力钢筋时梁的抗剪承载力计算的探讨.科学技术与工程, 10(25):6322—6326. http://www.wanfangdata.com.cn/details/detail.do?_type=perio&id=kxjsygc201025047
|
刘灿, 吴波, 2012a.高强螺栓作为横向预应力钢筋时的性能分析.武汉理工大学学报(交通科学与工程版), 36(4):769—772. http://www.wanfangdata.com.cn/details/detail.do?_type=perio&id=whjtkjdxxb201204027
|
刘灿, 吴波, 2012b.体外横向预应力混凝土梁构造设计优化分析.武汉理工大学学报(交通科学与工程版), 36(3):617—619, 623. http://www.wanfangdata.com.cn/details/detail.do?_type=perio&id=whjtkjdxxb201203042
|
刘灿, 吴波, 徐凯燕, 2008.横向预应力混凝土梁抗剪性能研究(英文).科学技术与工程, 8(10):2724—2727, 2741. http://kns.cnki.net/KCMS/detail/detail.aspx?dbcode=CJFD&filename=KXJS200810051
|
卢亦焱, 2016.混凝土结构加固设计原理.北京:高等教育出版社.
|
吴波, 刘灿, 徐凯燕, 2007.横向预应力混凝土梁的抗剪性能试验研究.地震工程与工程振动, 27(2):58—62. http://www.wanfangdata.com.cn/details/detail.do?_type=perio&id=dzgcygczd200702009
|
杨军民, 2011a.闭合预应力钢丝绳加固RC梁抗剪性能试验研究.泉州: 华侨大学.
|
杨军民, 郭子雄, 黄群贤, 2011b.预应力钢丝绳箍加固钢筋混凝土梁抗剪承载力计算方法.华侨大学学报(自然科学版), 32(4):422—426. http://www.wanfangdata.com.cn/details/detail.do?_type=perio&id=hqdxxb201104016
|
于天来, 史伟卓, 于国语等, 2012.钢丝绳布置方式对抗剪加固性能影响试验研究.武汉理工大学学报, 34(8):107—112. http://www.wanfangdata.com.cn/details/detail.do?_type=perio&id=whgydxxb201208021
|
张鑫, 李安起, 赵考重, 2011.建筑结构鉴定与加固改造技术的进展.工程力学, 28(1):1—11, 25. http://www.cqvip.com/qk/95324X/201101/36359966.html
|
周长东, 白晓彬, 赵锋等, 2013a.预应力纤维布加固混凝土圆形截面短柱轴压性能试验.建筑结构学报, 34(2):131—140. http://www.wanfangdata.com.cn/details/detail.do?_type=perio&id=jzjgxb201302017
|
周长东, 李季, 朱万旭等, 2013b.纤维复合材料自锁式锚具设计及力学性能研究.建筑结构学报, 34(2):141—148. http://www.wanfangdata.com.cn/details/detail.do?_type=perio&id=jzjgxb201302018
|
周长东, 田腾, 吕西林等, 2012a.预应力碳纤维条带加固高轴压比混凝土圆柱抗震性能试验研究.建筑结构学报, 32(11):115—123. http://www.wanfangdata.com.cn/details/detail.do?_type=perio&id=jzjgxb201211014
|
周长东, 田腾, 吕西林等, 2012b.预应力纤维条带加固震损混凝土圆墩抗震性能试验研究.铁道学报, 34(10):103—114. http://www.wanfangdata.com.cn/details/detail.do?_type=perio&id=tdxb201210017
|
周长东, 田腾, 吕西林等, 2012c.预应力碳纤维条带加固混凝土圆墩抗震性能试验.中国公路学报, 25(4):57—66.
|
Andrawes B., Desroches R., 2007. Comparison between shape memory alloy seismic restrainers and other bridge retrofit devices. Journal of Bridge Engineering, 12(6): 700—709. doi: 10.1061/(ASCE)1084-0702(2007)12:6(700)
|
Andrawes B., Shin M., Wierschem N., 2010. Active confinement of reinforced concrete bridge columns using shape memory alloys. Journal of Bridge Engineering, 15(1): 81—89. doi: 10.1061/(ASCE)BE.1943-5592.0000038
|
Budek A., Lee C. O., Priestley M. J. N., 2006.Seismic design of circular bridge columns with unstressed prestressing strand for transverse reinforcement. Fifth National Seismic Conference on Bridges & Highways.
|
Gamble W. L., Hawkins N. M., Kaspar I. I., 1996. Seismic retrofitting experience and experiments in Illinois. Buffalo: State University of New York.
|
Hartl D. J., Volk B. L., Lagoudas D. C., et al., 2006. Thermomechanical characterization and modeling of Ni60Ti40 SMA for actuated chevrons.ASME 2006 International Mechanical Engineering Congress and Exposition.
|
Hussain M. A., Driver R. G., 2004. Experimental study on the seismic performance of externally confined reinforced concrete columns. 13th World Conference on Earthquake Engineering.
|
Kim S. Y., Yang K. H., Byun H. Y., et al., 2007. Tests of reinforced concrete beams strengthened with wire rope units. Engineering Structure, 29(10): 2711—2722. doi: 10.1016/j.engstruct.2006.12.013
|
Saatcioglu M., Yalcin C., 2003.External prestressing concrete columns for improved shear resistance.Journal of Structure Engineering, 129(8): 1057—1070. doi: 10.1061/(ASCE)0733-9445(2003)129:8(1057)
|
Saatcioglu M., Yalcin C., 2004. Rectangular concrete columns retrofitted by external prestressing for seismic shear resistance.13th World Conference on Earthquake Engineering.
|
Saatcioglu M., Yalcin C., Mes D., et al., 2000.Seismic retrofitting concrete columns by external prestressing.OCEERC Research Report, Ottawa-Carleton Earthquake Engineering Research Centre, University Ottawa.
|
Shin M., Andrawes B., 2011. Lateral cyclic behavior of reinforced concrete columns retrofitted with shape memory spirals and FRP wraps. Journal of Structural Engineering, 137(11): 1282—1290. doi: 10.1061/(ASCE)ST.1943-541X.0000364
|
Taleie S. M., Moghaddam H., 2007. Experimental and analytical investigation of square RC columns retrofitted with prestressed FRP straps. University of Patras, (7): 16—18.
|
Vokoun D., Kafka V., Hu C. T., 2003. Recovery stresses generated by NiTi shape memory wires under different constraint conditions.Smart Material and Structures, 12(5): 680—685. doi: 10.1088/0964-1726/12/5/303
|
Yamakawa T., Banazadeh M., Fujikawa S., 2005. Emergency retrofit of shear damaged extremely short RC columns using pre-tensioned aramid fiber belts.Journal of Advanced Concrete Technology, 3(1): 95—106. http://www.wanfangdata.com.cn/details/detail.do?_type=perio&id=J-STAGE_3582485
|
Yang K. H., Byun H. Y., Ashour A. F., 2009. Shear strengthening of continuous reinforced concrete T-beams using wire rope units. Engineering Structure, 31(5): 1154—1165. doi: 10.1016/j.engstruct.2009.01.003
|
Yang K. H., Kim G. H., Yang H. S., 2011. Shear behavior of continuous reinforced concrete T-beams using wire rope as internal shear reinforcement. Construction and Building Materials, 25(2): 911—918. doi: 10.1016/j.conbuildmat.2010.06.093
|